Porta Verde from the street

Projects / 08

Porta Verde

Spatial design and environmental performance in a mixed-use urban prototype

Year
2024
Category
Design Studio
Location
Milan, Italy
Course
Architectural Design Studio + Sustainable Building Technologies Studio · Politecnico di Milano
Supervision
Prof. Filippo Paolo Pagliani, Prof. Gabriele Masera, Prof. Matteo Brasca
Team
Seyed Mojtaba Mohammadi, Raha Alaei, Yared Bekele, Sima Delkhosh, Amr Elkhouly, Ali Elsayed, Hanieh Farhad, Mobina Honarvar, Beantenew Lemma, Ali Navabi, Padideh Poormehrabi
Term
Fall 2024

This project joins two complementary studios, Architectural Design and Sustainable Building Technologies, into one proposal: a building in Milan that works as productive and social urban infrastructure while advancing sustainability, adaptability and ecological integration. At its core, nature, work and public life coexist.

Two studios, one proposal

This project joins two complementary studios, Architectural Design (AD) and Sustainable Building Technologies (SBT), into one proposal that merges architectural expression with performance-driven environmental strategies: a building that works as productive and social urban infrastructure while advancing sustainability, adaptability and ecological integration.

At its core, nature, work and public life coexist: the massing is shaped by iterative transformations responding to light, climate and access, accommodating communal spaces, productive landscapes and work environments. In parallel, the SBT studio adds passive and active energy strategies, façade performance studies and material optioneering, aligning design decisions with measurable environmental outcomes.

Integration rather than addition runs through the project: rooftop gardens and vertical farming shape its identity, social programs interlock with landscapes, and daylight, shading, ventilation and energy set the spatial hierarchy.

The corner with the timber shaders
02The corner with the timber shaders
Aerial view of the courtyard
03Aerial view of the courtyard

Workflow · mass optioneering

Over ten massing options, from courtyard to atrium types, were compared by surface-to-volume ratio and estimated energy use. Option 9 was chosen for its architectural value; its small energy gap could be recovered later in design.

Concept evolution

The form of the building was transformed through a sequence of seven steps aimed at functionality, sustainability and accessibility.

  1. 1Original structureThe existing building as found.
  2. 2DemolitionA specific part is demolished to enable new additions and reconfiguration.
  3. 3AdditionsNew volumes and a reconfigured plan.
  4. 4OrientationThe design is oriented to maximize solar gain.
  5. 5TerracesThe form is elevated to incorporate terraces, using shadow analysis.
  6. 6Roof courtsSurface areas are adjusted, introducing additional roof courts suitable for food production.
  7. 7AccessibilityThe form is further depleted to enhance accessibility at the ground level and across the structure.

Iterative form-finding and analysis guided each decision: massing options, daylight simulations and climate studies set the orientation, depletions and façade structure, balancing openness, shading and spatial efficiency. The result houses diverse programs and works as a self-regulating environmental system that cuts energy loads and improves comfort.

Passive and active strategies

Strong insulation of the existing building, double glazing, rooftop PV and roof vents; one HVAC zone at the top serves old and new parts and drives the stack effect.

Schematic sections, winter and summer
23Schematic sections, winter and summer

Program · a productive building

FloorProgramNet area
Groundcafé-bar, organic market, vertical farming, lobby, kitchen, lab1,022 m²
Firstco-working, meeting room, fresh bar, vertical farming, kitchen, lobby1,255 m²
Secondco-working, offices, meeting room657 m²
Thirdworkshop, meeting room, co-working, offices, general manager, lobby959 m²
Fourthrestaurant, kitchen, lobby542 m²
FifthHVAC zone, on top to drive the stack effect204 m²
Total4,639 m²
Exploded function diagram
29Exploded function diagram

Plans

Ground floor plan
12Ground floor plan
First floor plan
13First floor plan
Second floor plan
14Second floor plan
Third floor plan
15Third floor plan
Fourth floor plan
16Fourth floor plan
Fifth floor plan
17Fifth floor plan

Sections

Section
18Section
Section
19Section
Section
20Section
Section
21Section

Landscape

Around the courtyard the landscape gathers a seating area, shade-giving trees, fruit trees, a herb and vegetable garden that grows food on site, an outdoor café, ornamental shrubs, a lawn for gatherings and a hammock area. The plants were chosen for the site, so that the green zones invite everyone into the project.

Planting palette

Shade trees: Cornus kousa, Acer palmatum, Ilex verticillata, Taxus baccata. Fruit trees: Prunus domestica, Malus domestica, Punica granatum, Prunus laurocerasus. Shrubs: Hydrangea macrophylla, Pieris japonica, Sarcococca confusa. Herbs and vegetables: mint, kale, chard, lettuce, spinach, thyme, parsley, rosemary.

Landscape plan
11Landscape plan
Landscape section
30Landscape section
The courtyard and the bridge
04The courtyard and the bridge
Vertical farming inside the building
05Vertical farming inside the building

Daylight and shading

Every floor was simulated in ClimateStudio before and after shading. On the second floor, shaders and blinds cut the office area exposed to direct sun and glare from 22–73% to under 10%, while daylight autonomy stayed between 79 and 100%; the vertical farms keep the 500–5,000 lux their crops need.

Daylight analysis, ground floor, before and after shading
22Daylight analysis, ground floor, before and after shading
Shading optioneering
26Shading optioneering

Energy · in numbers

Step by step the energy use intensity fell from 284 kWh/m² for a standard medium office (ASHRAE 90.1) to about 68 kWh/m²: optimized hours and occupancy, low-g double glazing, insulation, zoning by function, a ground-source heat pump and stack-driven natural ventilation.

68
kWh/m² a year in the final model, down from 284 for the ASHRAE 90.1 baseline
76%
of occupied hours at 18–27 °C, first-floor offices
300,145
kWh a year from opaque and semi-transparent PV panels
87%
of the building's 344,856 kWh a year covered by PV
Energy use intensity, step by step
24Energy use intensity, step by step

HVAC and ventilation

A ground-source heat pump with variable air volume serves the whole building. The HVAC zone sits on top, so that the atrium and the roof greenhouse act as a solar chimney and drive natural stack ventilation from March to October.

Timber structure

Glued-laminated timber columns and beams carry CLT and LVL floor panels on steel standoffs and brackets. The frame was modelled and checked in Altair S-TIMBER and the foundations in S-FOUNDATION. Timber, still uncommon in Milan, was chosen for its renewable nature and warmth; coatings, ventilation and rainwater management protect it over a 50-year life.

Timber structure, Altair S-TIMBER
27Timber structure, Altair S-TIMBER
Timber structure
28Timber structure
Timber model of the building
10Timber model of the building

Envelope

A unitized curtain wall wraps the new volumes, a stick system the bridge and greenhouse, with vertical wooden shaders on facades and courtyard. Opaque and semi-transparent PV covers the roofs; opaque panels are clad in grey travertine.

Exploded envelope
25Exploded envelope

Physical model and views

Physical model of the building: corner, east and south facades.

Physical model: corner
07Physical model: corner
Physical model: east facade
08Physical model: east facade
Physical model: south facade
09Physical model: south facade
Night view
06Night view