Pedestrian bridge design based on aggregation architecture

Year
2018
Category
Design Studio
Location
Norheim, Norway
Course
Architectural Bionic Technology Design Studio 03 · Pars University of Architecture and Art
Supervision
Dr. Mohammadreza Matini
Team
Seyed Mojtaba Mohammadi
Term
Fall 2018

ESTA is an aggregated bridge: a large arrangement of loose elements, continuously observed and modulated by the architect at the particle or system level, that together perform the architectural and structural tasks of a bridge. The name is of Italian origin and means “from the east”; in Spanish it also means “this”: simple, pure and bare-bones.

An aggregated bridge

ESTA is an aggregated bridge: a large arrangement of loose elements, continuously observed and modulated by the architect at the particle or system level, that together perform the architectural and structural tasks of a bridge.

The modules were inspired by the herb Centaurea calcitrapa, the purple star thistle common in the Middle East. The name is of Italian origin and means “from the east”; in Spanish it also means “this”, which suggests what is being sought: simple, pure and bare-bones.

ESTA is the beginning of the aggregation research that Saleria later continued and completed.

Keywords: technology / bionics / nature / aggregation

Aggregated modules
24Aggregated modules

Observation and inspiration

Observations and experiments showed the sharp yellow thistle of Centaurea calcitrapa to be the best natural particle for interlocking: in aggregation tests these natural modules locked together efficiently and formed arches.

Centaurea calcitrapa, the purple star thistle
02Centaurea calcitrapa, the purple star thistle
The thistle's spines
03The thistle's spines
Acaena echinata fruit
04Acaena echinata fruit

Research

Our experiments showed that a star-shaped module is the best particle for forming an arch to build a bridge; among natural modules, the star thistle comes closest.

Two structures inspired by honey locust thorns were designed as buttresses that anchor and join the aggregated modules on both banks of the river; the results show the method to be effective.

Honey locust thorns
05Honey locust thorns
Buttress and aggregation test
14Buttress and aggregation test

Modules

The aggregate element has 14 spikes, seven in each of two planes, loosely connected to each other; burrs and the spines of Centaurea calcitrapa inspired the model. Three earlier modules failed before the star was found.

The 14-spike module
07The 14-spike module
Module geometry
08Module geometry
Two modules interlocking
06Two modules interlocking
Failed module 1
10Failed module 1
Failed module 2
11Failed module 2
Failed module 3
12Failed module 3

Computational simulation

After the physical experiments came computational simulation. Itasca PFC 3D, Rhino FlexHopper and 3ds Max MassFX were tested; MassFX was chosen for its ease of use.

Chained modules

Because aggregation failed repeatedly in simulation, some single modules were linked into three-module chains. With rigid buttresses at the lower level, the chained modules were used in the upper levels, which made the structure more stable and the process more efficient.

Results of the simulation

Each stage of the aggregation was verified in MassFX. Accepted attempts with the approved modules: single modules in red, chained modules in blue.

Chained modules
09Chained modules
Simulation in 3ds Max MassFX
13Simulation in 3ds Max MassFX

Form analysis and architectural design

Only the second space opens to the outside, so it becomes a breathing space and a viewpoint, with a breathtaking view and a captivating sense of suspension. The third and fourth spaces, grouped at random, form a larger space for the elevator and a place for food and drink.

The fifth space is a gallery of light and shadow: aggregated modules line the ceiling and the walls, with shades and glass, and daylight filtering through them casts dark dapples of light and shadow.

Decks on the surface of the bridge sit on the last aggregated levels and serve specific architectural functions. Because the bridge is long and spacious, three elevators give access: one at each end and one near the middle, serving the restaurant and the cafeteria.

Section, spaces inside the aggregation
21Section, spaces inside the aggregation
Section perspective
23Section perspective
Plan
19Plan
Section
20Section
Section
22Section

Proposed construction steps

  1. 1SupportsInstallation of supports and creation of temporary arched structures.
  2. 2AggregationProcess of aggregation.
  3. 3Interior spacesInstallation of the interior spaces and covering them with single and chained modules.
  4. 4CompletionContinuing the aggregation process and removing the temporary arched structures.
Construction sequence 1
15Construction sequence 1
Construction sequence 2
16Construction sequence 2
Construction sequence 3
17Construction sequence 3
Construction sequence 4
18Construction sequence 4